Virginia index · last changed 12 September 2026

Virginia research coverage.

See the available records, draft source-family audit and remaining research gaps. A state page is not a complete inventory of its data centers.

0 recordsVA

Research coverage

Research draft available; independent coverage review pending

Research draft available. Candidate findings and statewide coverage await independent review.

Draft source attempts: 2026-09-11 through 2026-09-11. These are draft audit dates, not a new independent check.

0 reviewed project/campus records; 0 reviewed facility/building records; 0 uncounted records. Inventories are non-additive.

Draft source-family roster and gaps
  • economic development incentives — searched

    Source references: VA-S0003, VA-S0004, VA-S0005, VA-S0006, VA-S0007, VA-S0064

    • No public list of DCRSUT memorandum-of-understanding signatories or their localities.
    • Governor's office release URLs found in search returned HTTP 404 and the VEDP press index exposed no announcement titles in the fetched HTML, so most project-level state announcements were not read.
    • Local economic development authority announcements were reached only for Botetourt, Wythe, Louisa and Wise counties.
  • utility commission large load — searched_partial

    Source references: VA-S0008, VA-S0009

    • Individual filings in PUR-2025-00058 and in Dominion's integrated resource plan and transmission certificate cases were not opened; the SCC docket search system was not exercised.
    • No large-load or interconnection record naming a specific Virginia customer was retrieved.
  • environmental construction permits — searched_partial

    Source references: VA-S0026, VA-S0027, VA-S0028, VA-S0029, VA-S0030, VA-S0031, VA-S0032, VA-S0033

    • DEQ air permit list and permits 74288-2, 74341-1, 53266-1 and 74241-3 unread (HTTP 403).
    • Corps of Engineers public notices NAO-2022-02394 and NAO-2013-01922 unread (HTTP 403).
    • No water withdrawal, VPDES or stormwater construction notices were searched.
    • County building, grading and land disturbance permits were reached only through the Botetourt County narrative.
  • municipal planning assessor gis — searched

    Source references: VA-S0001, VA-S0010, VA-S0011, VA-S0012, VA-S0013, VA-S0014, VA-S0015, VA-S0016, VA-S0017, VA-S0018, VA-S0019, VA-S0020, VA-S0021, VA-S0022, VA-S0025, VA-S0034, VA-S0035, VA-S0036, VA-S0037, VA-S0038, VA-S0039

    • Loudoun County's LOLA land application system and all individual Loudoun cases were not reached; Loudoun holds the largest concentration of Virginia data centers.
    • Caroline County's rezoning case list timed out, and the City of Chesapeake and Town of Warrenton sites refused connections.
    • No assessor or GIS parcel query was run for any county.
    • Prince William's Data Center Opportunity Zone Overlay page returned HTTP 403.
  • tax abatement development agreements — searched_partial

    Source references: VA-S0023, VA-S0024

    • No executed agreement document was read; only county descriptions of agreements.
    • King George County's performance agreement report (the central document in the Amazon dispute) is unread after two 90-second timeouts.
    • Local data center equipment tax rates were seen only through news reporting for Hanover, Henrico and Chesterfield.
  • operator disclosures — searched_partial

    Source references: VA-S0040, VA-S0041, VA-S0042, VA-S0043

    • No AWS, Oracle or Apple disclosure was located for Virginia sites.
    • Colocation operator location pages (Equinix, Digital Realty, CyrusOne, NTT, QTS, Vantage, STACK, CloudHQ, Iron Mountain and others) were not opened; those campuses remain dataset leads only.
    • Meta's Henrico County campus could not be confirmed from operator material.
  • open datasets directories — searched

    Source references: VA-S0044

    • Roughly 80 building-level Northern Virginia records (Digital Realty, CyrusOne, NTT, QTS, Iron Mountain, Vantage, Equinix halls) were deliberately not turned into candidates, so this backlog under-represents operating capacity.
    • No other directory (Data Center Map, Baxtel, datacenters.com, Cloudscene, PeeringDB) was consulted.
  • historical closures withdrawals names — searched

    Source references: VA-S0002, VA-S0045, VA-S0046, VA-S0047, VA-S0048, VA-S0049, VA-S0050, VA-S0051, VA-S0052, VA-S0053, VA-S0054

    • A Data Center Dynamics headline indicates the Pittsylvania plan was 'withdrawn again' after the April 2025 denial; that later filing could not be verified (HTTP 403).
    • No county record was retrieved for the Chesapeake, Fredericksburg, Dulles South, Franklin or LS Power decisions.
    • Renames and acquisitions were captured only where a fetched source stated them (Solis Arx/Fluidstack, the Compass/H&H Digital Gateway rezoning).
  • news and other discovery — searched

    Source references: VA-S0055, VA-S0056, VA-S0057, VA-S0058, VA-S0059, VA-S0060, VA-S0061, VA-S0062, VA-S0063

    • FauquierNow, Virginia Mercury and Data Center Dynamics returned HTTP 403 and Cardinal News HTTP 429, so the Warrenton litigation status and the later Pittsylvania filing rest on search-result headlines only.
    • The session's web search budget was exhausted partway through, so Stafford, Louisa, Caroline, Henrico/Meta, Mecklenburg, Botetourt and Fauquier follow-up searches were never run.

No reviewed records published. This does not mean there are no data centers in this state.