Record details
- Record ID: vantage-quincy-campus-wa
- Record type: campus
- Developer: unknown
- Operator: Vantage Data Centers
- Owner: unknown
- Tenant: unknown
- Capacity: 49.5 MW (backup generation permitted · campus scope)
- Capacity boundary: Ecology states a 49.5 MW facility total for installed emergency generators in Phases One and Two. The component figures printed in the order do not sum to that total. This is permitted backup generation, not critical IT capacity, utility service or measured load. Phase Three equipment is outside the stated total.
- Location: 2101 M Street NE, Quincy, Grant, WA
- Location precision: exact — The exact street address, city and county are stated in Ecology Approval Order 23AQ-E056; exact does not mean a surveyed parcel or building footprint.
- Physical scale: The order describes a three-phase campus: Buildings One and Two were in place and Building Three was planned. This is not a finding that three buildings were operating on the review date.
How to read power and capacity figures →
What remains unknown
- critical IT capacity
- utility service and measured load
- current completion or operating status of Building Three
- tenant identities
- surveyed parcel and building footprints
Sources
-
Washington State Department of Ecology — data centers regulated or reviewed by Ecology →Gov. record
Exact location Quincy — Vantage entry and linked approval order
What it supports State regulator's project index and link to the site-specific order; the index explicitly says it is not a complete list of every Washington data center.
-
Ecology Approval Order 23AQ-E056 — Vantage Quincy →Gov. record
Exact location Project Summary and Equipment sections
What it supports Existing-campus identity, Vantage role, exact address, phased-building boundary and the separately typed emergency-generator figure.