Canonical fields
- Stable ID: gilroy-data-center
- Unit: project
- Developer: unknown
- Operator: unknown
- Capacity: 49 MW (utility request · phase scope)
- Capacity boundary: City-stated Phase I connection requirement to PG&E; not critical IT capacity, campus design capacity or measured load.
- Location: 8050 Camino Arroyo, Gilroy, Santa Clara, CA
- Location precision: exact — City project page identifies APN 841-69-044. No parcel geometry or building centroid is published here.
- Physical scale: A 56-acre site with two planned data-center buildings and one security building, about 438,500 square feet in total. Phase I is one planned 218,000-square-foot data-center building; planned buildings are not operating buildings.
What remains unknown
- developer
- owner
- operator
- critical IT capacity
- campus design capacity
- measured load
- opening or completion date
Sources
-
Gilroy Data Center by AWS — AS 20-23 →Gov. record
Exact location Project Background and Information; Project Description
What it supports Project number, applicant role, status, permit dates, address, parcel, Phase I utility-request scope and planned physical scale.