Canonical fields
- Stable ID: brookfield-paducah-site-ai-campus-ky
- Unit: campus
- Developer: Brookfield
- Operator: Brookfield
- Owner: unknown
- Tenant: unknown
- Capacity: 1.8 GW (company design · campus scope)
- Capacity boundary: DOE describes a new 1.8 GW AI/HPC campus but does not label the figure critical IT load, gross facility load, approved utility service, measured load or current consumption. It is retained only as an announced campus design.
- Location: KY
- Location precision: approximate — The announcement limits the location to portions of DOE's Paducah Site in western Kentucky. The federal site's proper name is not converted into a city, street address, county, parcel or coordinate.
- Physical scale: Unknown. The announcement provides no data-center building count, floor area, site acreage or parcel boundary. The announced investment and job estimates are not physical scale.
What remains unknown
- street address
- parcel
- city and county situs for the selected campus portions
- coordinates
- data-center land or building owner
- tenant
- critical IT capacity
- gross facility load
- approved utility-service amount
- measured load
- Kentucky PSC case number and decision
- building count or floor area
- construction-start evidence
- completion or opening evidence
Sources
-
Exact location Opening paragraph; ratepayer-protection paragraph; participant-selection paragraph; final construction-forecast sentence
What it supports Campus proposal and Paducah Site location boundary; Brookfield's selected future developer/operator roles; announced 1.8-GW AI/HPC campus design; separate generation and storage roles; pending PSC approval; forecast 2031 completion.