campus · KS · last checked 13 September 2026

Beale Data Center

The City of De Soto's current Beale project page says grading and early site preparation are underway; its general data-center page labels Beale's status Site Preparation / Grading. The same project page says the Phase 1 site plan for Buildings 1 and 2 has conditional City approval. This establishes bounded site work, not completed buildings or operation.

Status: construction Layer: verified Rights: reference_only