Canonical fields
- Stable ID: applied-digital-polaris-forge-2-harwood-nd
- Unit: campus
- Developer: unknown
- Operator: unknown
- Capacity: 200 MW (critical it · phase scope)
- Capacity boundary: The filing describes a data-center lease to deliver 200 MW of critical IT load to an unnamed hyperscaler, phased across the initial two buildings. This is contracted future critical IT load, not current or measured load, utility-service capacity or an entire future-campus total.
- Location: ND
- Location precision: approximate — The SEC filing says near Harwood, North Dakota and elsewhere calls it the company's campus in Harwood. It gives no street address, parcel, county or coordinates; Harwood is retained only in the stable ID as the source's place label.
- Physical scale: The leased initial 200 MW is phased across two buildings expected to come online in 2026. These are planned construction-phase buildings, not two operating facilities and not a complete campus building count.
What remains unknown
- street address
- parcel identifier
- county and municipal situs
- exact coordinates
- ultimate land or campus owner
- developer role
- operator role
- hyperscaler tenant identity
- utility request or approved service capacity
- measured load
- construction permit or inspection
- current completion or operating evidence
- full-campus design capacity beyond the initial phase
Sources
-
Applied Digital Form 10-Q for the quarter ended February 28, 2026 →Gov. record
Exact location Part I, Item 2, HPC Data Center Hosting Business, paragraph beginning 'On August 18, 2025'; Note 14, Leases — Lessor Accounting, paragraph beginning 'On October 20, 2025'
What it supports Polaris Forge 2 name and near-Harwood location, project-begun/currently-under-construction statements, APLD FAR-01 LLC and APLD FAR-02 LLC as lessor subsidiaries, unnamed hyperscaler tenant boundary, two-building phase and leased 200 MW critical IT-load scope.