Canonical fields
- Stable ID: al-bessemer-land-data-center
- Unit: project
- Developer: unknown
- Operator: unknown
- Owner: unknown
- Tenant: unknown
- Capacity: Unknown (No independently supported figure)
- Capacity boundary: No data-center MW figure appears in the opened City record. Reported campus-design or utility figures from non-qualifying sources are excluded.
- Location: Bessemer, Jefferson, AL
- Location precision: approximate — The ordinance lists five addresses plus parts of five tax parcels in Sections 26 and 27, Township 19S, Range 5 West. Because this is a multi-address, partial-parcel zoning area, no single project address or coordinate is asserted.
- Physical scale: The ordinance calls the approved land use a multi-phased data center but provides no phase count, building count, floor area, site acreage or electrical scale.
What remains unknown
- single site address or complete parcel boundary
- coordinates
- separately verified property owner
- developer
- operator or tenant
- critical IT capacity
- utility request or approved service capacity
- building count or floor area
- building permit or construction start
- completion or opening evidence
Sources
-
City of Bessemer City Clerk — AL Bessemer Land LLC Rezoning Ordinance →Gov. record
Exact location Link labeled 'AL Bessemer Land LLC Rezoning Ordinance'; linked scanned Ordinance No. 3698, PDF p. 1 first WHEREAS and Section 1; p. 2 Sections 2 and 4/adoption block; p. 3 mayoral approval
What it supports City publication provenance; application filer and owner-field wording; data-center land use; Bessemer/Jefferson location; listed addresses and partial parcels; rezoning adoption and approval date.