Georgia index · last changed 12 September 2026
Georgia research coverage.
See the available records, draft source-family audit and remaining research gaps. A state page is not a complete inventory of its data centers.
Research coverage
Research draft available; independent coverage review pending
Research draft available. Candidate findings and statewide coverage await independent review.
Draft source attempts: 2026-09-12 through 2026-09-12. These are draft audit dates, not a new independent check.
0 reviewed project/campus records; 0 reviewed facility/building records; 0 uncounted records. Inventories are non-additive.
Draft source-family roster and gaps
- economic development incentives — searched
Source references: GA-S0001, GA-S0002
- Neither DOR document names a recipient, so no exemption certificate holder could be identified.
- The earlier (pre-May 9 2022) county table linked on the same page was not opened.
- Georgia Department of Community Affairs Development of Regional Impact filings, which several candidates are said to have submitted, were not searched at all.
- utility commission large load — searched_partial
Source references: GA-S0003, GA-S0004, GA-S0005
- No searchable Georgia PSC docket URL was exposed, so docket 44280's full filing list and any Georgia Power IRP or large-load report were not enumerated.
- The order PDFs could not be read (image-only scans, no OCR performed), so nothing is quoted from the orders themselves.
- Georgia Power's Integrated Resource Plan, its large-load queue reporting and any electric service agreements were not retrieved; no candidate has a utility_request_mw figure.
- Several candidates are described as having applied to Georgia Power for specific loads (for example a 99 MW maximum at Statesboro and a 288 MW grid connection at Cartersville); none of those applications was located.
- environmental construction permits — searched_partial
Source references: GA-S0006, GA-S0007, GA-S0008, GA-S0009
- GEOS was unavailable (HTTP 503); no Georgia air permit application or issued permit was retrieved.
- The Georgia EPD air-quality permit reported issued for Serverfarm on 2026-06-29 and the 2026-07-02 Notices of Violation were not retrieved from EPD.
- The Georgia EPD reference SAS-2024-00075 associated with the DC BLOX Rockdale campus was not retrieved and is recorded only as a note.
- No water withdrawal, stormwater or county land-disturbance permit was searched for any candidate.
- municipal planning assessor gis — searched_partial
Source references: GA-S0010, GA-S0011, GA-S0012, GA-S0013
- Effingham County's Project Camellia page timed out twice; the largest single Georgia project in this packet has no county record.
- Coweta County's zoning case system was not reached, so Project Sail, Project Peach, Project Oak and Bridgeport have no county record.
- No Bartow, Spalding, Douglas, Newton, Floyd, Carroll, Fulton, Rockdale, Richmond, Columbia, Hall, Muscogee, Troup, Early, Bulloch, Clayton or Cobb agenda, minutes or zoning file was retrieved.
- Only one Georgia assessor or GIS parcel record was queried, so 68 of 70 candidates carry no parcel identifier.
- Web search quota was exhausted partway through Georgia, so remaining county portals could only be reached by guessing URLs.
- tax abatement development agreements — searched_partial
Source references: GA-S0014, GA-S0015
- No Georgia development authority agreement, bond resolution or superior court validation order was retrieved; the Clayton County award is documented only through a news account.
- The Fayette County Development Authority incentives page returned HTTP 403.
- The $1.2 billion Integra SPV equipment-bond validation reported for CoreWeave Dalton II in June 2026 was not obtained, so the queued GA-C0019 has no agreement in evidence.
- The Town of Tyrone record affirmatively states no abatement was requested or offered there, which is the only abatement fact confirmed from a government source in this packet.
- operator disclosures — searched
Source references: GA-S0016, GA-S0017, GA-S0018, GA-S0019, GA-S0020
- DC BLOX's Rockdale page returned 403 and T5's Atlanta IV page 404, so the 154 critical IT MW and 200 MW phase-one figures noted by the dataset are not recorded.
- Microsoft, QTS, Switch, STACK, CoreSite, Digital Realty, Flexential, Aligned, Edged, Vantage, DataBank, Northern Data, Prologis, CyrusOne and Serverfarm pages were not individually read.
- Oracle and Apple disclosures were not checked for Georgia at all.
- Amazon's release gives no site, acreage or capacity for either Georgia county.
- open datasets directories — searched
Source references: GA-S0021
- Compute Atlas source URLs were followed only for the Whitfield parcel, the SELC letter, the Clayton and Coweta news items and the operator pages; most of its press links were not opened.
- The dataset notes a QTS Atlanta DC2 building record that is not in this state extract and therefore is not a candidate here.
- No unlicensed directory was used, so Georgia facilities absent from Compute Atlas — smaller colocation sites in particular — are missing.
- historical closures withdrawals names — searched
Source references: GA-S0022, GA-S0023
- No county or city record of any Georgia withdrawal or denial was retrieved; both documented ones rest on news accounts.
- A report that the Temple / Project Bus developer pulled its proposal appears in the dataset's own source list but was never opened, leaving GA-C0004's status in conflict.
- Older Georgia closures, demolitions and acquisitions before 2024 were not searched.
- Newton County and Floyd County data center moratoriums referenced in the dataset's sources were not retrieved.
- news and other discovery — searched_partial
Source references: GA-S0024
- Only one background article was read; the large volume of Georgia data center reporting seen in dataset source lists was not opened.
- Advocacy and research trackers other than the SELC enforcement letter were not consulted.
No reviewed records published. This does not mean there are no data centers in this state.