Canonical fields
- Stable ID: velco-new-haven-operations-facility-vt
- Unit: building
- Developer: unknown
- Operator: unknown
- Owner: unknown
- Tenant: unknown
- Capacity: Unknown (No independently supported figure)
- Capacity boundary: No critical-IT, gross-facility, utility-request, utility-service or measured-load MW is published. Annual MWh and utilization percentages in the town plan are 2020 forecasts, not measured use or IT capacity. Backup-generator ratings and the 32 kW solar array are not data-center load or capacity and are excluded.
- Location: 760 Main Street, New Haven, VT
- Location precision: exact — The PUC order identifies the approved project at 760 Main Street (VT Route 17) in the Town of New Haven, Vermont. Exact refers only to the stated project street address, not a surveyed parcel boundary, current entrance, coordinates or building footprint. The separately opened January 30, 2020 PUC site-visit memorandum identifies the same case and address.
- Physical scale: The 2020 final order describes a two-story main operations building of approximately 18,000 square feet. This is the historical approved design for a multi-use building that includes a secondary data center, not data-hall area, as-built area, commissioned compute area or current measured size. The separate generator building is not another data-center building. Later amendments and as-built scale are not consolidated here.
What remains unknown
- pre-operation CPG condition 12 filing and actual operation date
- completion, commissioning, energization and current data-center operating status
- complete post-2020 amendment and compliance record, including case 20-3879-PET
- current as-built scale, data-hall area and surveyed building or parcel boundary
- separately resolved legal developer, operator, owner and tenant roles
- critical-IT, gross-facility, utility-request, utility-service and measured-load capacity
- current LEED certification disposition
Sources
-
2025 New Haven Town Plan — adopted March 4, 2025 →Gov. record
Exact location PDF p. 3 title/adoption date; printed p. 50 / PDF p. 52 project description and footnote 9; printed p. 65 / PDF p. 67 forecast attribution and table
What it supports Municipal identification of the VELCO backup operations/data-center project in New Haven; explicit November 6, 2020 forecast boundary. March 4, 2025 is the adoption date, not an asserted web publication date. Does not establish commissioning or utilization.
-
Vermont PUC case 19-4582-PET — site-visit memorandum dated January 30, 2020 →Gov. record
Exact location PDF p. 1, memorandum date and first two body paragraphs
What it supports Independent government-hosted case/address crosswalk to 760 Main Street, New Haven and VELCO signage; a scheduled site visit is not approval, construction or operation. The memorandum date is not an asserted publication date.
-
Vermont PUC case 19-4582-PET — final order and certificate of public good, August 12, 2020 →Gov. record
Exact location 48-page PDF: final order pp. 1–2, 5–8 and 34–35; certificate PDF pp. 38–40, especially condition 12; filed date PDF p. 46
What it supports Approved identity, address, main-building unit, historical approximately 18,000-square-foot design, secondary-data-center use and pre-operation filing boundary. Google Drive is only a hosting locator and is not a qualifying government host; authenticity crosschecked through the official VELCO project-page link and government case/address record.
-
Vermont PUC case 22-0557-PET — order granting non-substantial change determination, April 14, 2022 →Gov. record
Exact location PDF pp. 1–3 background and findings; pp. 6–7 adopted order and filed date
What it supports Same project/address and 2022 fiber-connection change determination; identifies an intervening March 18, 2021 CPG amendment in case 20-3879-PET. No completion or operation finding. Drive hosting alone is non-qualifying.
-
VELCO 2024 Environmental, Social, Governance Report →Company
Exact location Printed/PDF p. 15, Facilities section, New Haven paragraph in lower left
What it supports Utility-reported building nearing completion in the report's dated context, with LEED certification only hoped for in 2025; not current progress, data-center commissioning, operation or certified LEED status. The 2025-04 upload path is not a publication date.
-
VELCO — New Haven Operations Facility project page →Company
Exact location Project Highlights; Public Utility Commission Issued Documents, Certificate of Public Good and PUC Order Granting Non-Substantial Change links
What it supports Official utility identity/use description and provenance links for the exact two reviewed PUC documents. The dated forecast timeline is not completion evidence; the separate Final Order link leads to a different Middlebury project and is excluded.