operating facility · DE · last checked 14 September 2026

JP Morgan Chase CDC 1

DNREC's December 2021 review memorandum calls JP Morgan Chase CDC 1 a Tier 4 data center and states that existing Permit APC-2003/0285-OPERATION (Amendment 4) allowed the facility to operate 12 existing emergency generators. DNREC's May 2026 annual program report still lists JP Morgan Chase - Bear Christiana Road among the facilities billed for calendar year 2025. This establishes a permit-defined existing operating facility and continuing regulatory identity; it does not establish current IT load, occupancy, uptime, every-building operation, or issuance of the opened Amendment 5 draft.

Status: operating Status evidence: DNREC permit-defined existing facility; dated operating-facility evidence, not real-time IT utilization Layer: verified Rights: reference_only