Facility snapshot
- Operator as published
- Zenith Volts Corp.
- Address and locality
- Roswell · Chaves County · New Mexico
- Lifecycle status
- reported permitted
- Facility type
- data center
- Reported capacity
- Planned: 1,240 MW (source-reported; boundary not independently verified)
- Source freshness
- 15 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001592
What the source record says
Approximately 20 miles south of Roswell. Chaves County Commission approved; 300-acre initial footprint within an 8,500-acre approved site. On-site solar, gas, geothermal, and battery storage. Targets November 2027 operational; approximately 140 FTE jobs.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported permitted
Chaves County Commission approved; 300-acre initial footprint within an 8,500-acre approved site; targets November 2027 operational.
Sources and attribution
- Zenith Volts Corp secures county approval for scalable data center 20 miles south of Roswell, NM · PR Newswire
- Zenith obtains planning approval for 1.24GW data center project in Roswell, New Mexico · Data Center Dynamics
- Chaves County (chavescounty.net)
- Pacifico, Zenith Volts and Fermi America propose gigawatt-scale energy solutions with BESS to feed US data centres · Energy-Storage.news
- Chaves County approves data center project amid rising demand for computing infrastructure · Yahoo News
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID zenith-volts-roswell-chaves-county-data-center-nm. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.