Licensed lead · not independently verified · dcd-dir-001591

Tooele Valley Data Center Campus

reported proposed

Zenith Development

Burmester · Tooele County · Utah

Planned 500 MWSource updated 25 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Zenith Development
Address and locality
Burmester · Tooele County · Utah
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 500 MW (source-reported; boundary not independently verified)
Source freshness
25 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001591

What the source record says

500MW on-site gas-fired data center campus (~200-600 acre portion of a larger ~600-acre Tooele Valley Public Infrastructure District development that also includes a truck stop, hotel, and warehouses near I-80); backed by Utah Inland Port Authority financing. Developer plans a reverse-osmosis plant discharging ~250,000 gallons/day of brine into Great Salt Lake wetlands, drawing significant local opposition. Subsidies checked (2026-09-08): no site-level subsidy confirmed for this parcel. A $4.875M Utah Inland Port Authority Infrastructure Bank loan was reported in April 2024 to Zenith Bolinder, LLC — the Delaware LLC that petitioned UIPA in March 2024 to create the Tooele Valley Public Infrastructure District, representing 100% of surface property owners within it, and which KSL describes as "a partnership with longtime Utah developer Zenith Development"; Charles Akerlow appears both as the petition's contact sponsor and as Zenith Development's managing director. The two are affiliated but are not the same legal entity, the loan terms were not confirmed against a primary document, and the district's boundary exhibit is a scanned image that could not be read — so whether that loan reaches this data-centre parcel is unresolved. UIPA's executive director stated in July 2026 that the authority's involvement covers transportation within a 600-acre portion and does not extend to the southern section planned for the data centre.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-07-27 · reported proposed

    Public hearing held on a state water-discharge permit (UPDES UT0026409) required for the project; permit still pending as of the hearing.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID zenith-tooele-valley-burmester-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →