WhiteFiber NC-1 AI Data Center Campus

reported operational

WhiteFiber (Bit Digital)

Madison · Rockingham County · North Carolina

Planned 200 MWOperational 24 MWSource updated 29 August 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
WhiteFiber (Bit Digital)
Address and locality
Madison · Rockingham County · North Carolina
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 24 MW; Planned: 200 MW (source-reported; boundary not independently verified)
Source freshness
29 August 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001575

What the source record says

Operator is WhiteFiber (Bit Digital's AI unit); Nscale is the 40 MW anchor tenant (10-year, ~$865M total contract value = revenue, not capex — in notes). ~1M sq ft, up to 150 kW/cabinet, 99 MW secured from Duke Energy, 200 MW eventual site potential (planned figure). $150M WhiteFiber equity. Madison is in Rockingham County, NC. Coordinates are the Madison town centroid. Property acquired for $45M (2025, from Unifi); the total buildout described as 'over $1B' is conditional on reaching 200 MW -> investmentUsd omitted. ~60 permanent jobs (~$67k avg) were pledged (Rockingham County) - a commitment, with the facility still under construction -> jobs honest-zero. Cooling type not publicly disclosed -> water honest-zero.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · reported under construction

    WhiteFiber (Bit Digital's AI unit) acquired a ~1M sq ft NC industrial property for an AI/HPC campus; Nscale signed a 10-year, 40 MW anchor colocation (~$865M TCV)

    Open cited source →

  2. 2026-08-15 · reported operational

    WhiteFiber's Q2 2026 results report that NC-1 has moved from construction into customer deployment: initial capacity has been delivered, equipment startup and customer testing are underway, initial billing has commenced, and full contracted run-rate billing across the 40 MW of contracted IT load was expected during August 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID whitefiber-nc1-madison-nc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.