Facility snapshot
- Operator as published
- W Holdings
- Address and locality
- Maricopa · Pinal County · Arizona
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 28 August 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001556
What the source record says
Located south of the City of Maricopa, east of State Route 347 and west of the Nissan test track, abutting the southern boundary of the Ak-Chin Indian Community. Investment is recorded as the itemized $4B construction plus $5.5B equipment figure presented to the Planning and Zoning Commission; a separate report rounds the total to $10B. Acreage is also reported as 500 and, in one account, 656 acres. Some coverage associates the site with Copia Power; the applicant of record in commission and board coverage is W Holdings, represented by the same attorney who has appeared for Copia projects, so the corporate relationship is not established here.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-11-20 · reported proposed
Pinal County Board of Supervisors unanimously approved the major comprehensive plan land-use amendment; rezoning still required.
Sources and attribution
- $10 billion data center campus OK'd south of Maricopa · InMaricopa
- Commission Recommends Data Center Campus Despite Resident, Tribal Pushback · Pinal Post
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID w-holdings-energy-generation-technology-campus-maricopa-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.