This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Volt Edge Energy
- Address and locality
- 265 Midway Drive · Union · Union County · South Carolina
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 49 MW (source-reported; boundary not independently verified)
- Source freshness
- 13 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001554
What the source record says
Site address per the Union County Development Board's own park page is 265 Midway Drive, Union, SC 29379 (a secondary source gave 260 Midway Drive; the two geocode ~40m apart, consistent with the same industrial park). Coordinates geocoded from that street address via the US Census geocoder — not stated as facility coordinates by any source, and the industrial park spans multiple parcels so the specific building footprint is unconfirmed. No source names an AI-specific workload for this site, so aiClassification is omitted.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Union County tables tax breaks for $400M data center | Project Alpaca · Fox Carolina
- Midway Green Industrial Park · Union County Development Board
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID volt-edge-project-alpaca-union-county-sc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.