Volition Spanish Fork Data Center

reported proposed

Volition Industries

Spanish Fork · Utah County · Utah

Planned 250 MWSource updated 8 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Volition Industries
Address and locality
Spanish Fork · Utah County · Utah
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 250 MW (source-reported; boundary not independently verified)
Source freshness
8 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001553

What the source record says

Proposed retrofit of a ~1M sq ft former Fingerhut distribution warehouse at the mouth of Spanish Fork Canyon; faced significant resident opposition at an August 20, 2026 public hearing; not yet zoned for the use. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. The company is on record declining to seek one: "Volition is not requesting any tax breaks, Chavez said, and instead would be generating around $44 million in tax revenue for the city, school district and other taxing entities." No Spanish Fork RDA/CRA project area or participation agreement naming Volition or the site was located. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-08-20 · reported proposed

    Spanish Fork City Council tabled a vote on the municipal-code amendments (Title 15) needed to permit the project, pending written council concerns due August 24, 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID volition-spanish-fork-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.