This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Vermaland LLC
- Address and locality
- Eloy · Pinal County · Arizona
- Lifecycle status
- reported cancelled
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 28 August 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001547
What the source record says
Vermaland LLC is a Phoenix-area land developer and land-banking company (CEO Kuldip 'Ken' Verma, founded 2006, controls ~25,000 acres of metro Phoenix land). DCD explicitly noted 'it is unclear whether Vermaland would operate its own data center facilities' — Vermaland plans to sell or rent parcels/buildings to tenants. No end tenants or hyperscaler operators have been named as of July 2026. Original plan: 59 data centers, up to 3 GW capacity ceiling, up to $33B investment ceiling, 3,300-acre site south of Eloy along the Greene Canal. A separate adjacent 1,700-acre parcel already holds Industrial-2 zoning for data centers, gas plants, battery storage, and solar. After strong public opposition (all ~60 public comments opposed), operator announced May 2026 scale-back to 11 data centers and 1 GW ceiling. Board of Supervisors hearing scheduled August 26, 2026; no permits issued as of record date. Site lies adjacent to a Qualified Opportunity Zone (investor tax benefit; not a direct subsidy to Vermaland — no subsidy award confirmed, omitted). Coordinates are approximate (parcel south of Eloy city center along Greene Canal; no precise APN published). $33B investment and all GW figures are announced ceilings, not firm commitments.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025 · reported proposed
Vermaland publicly announces La Osa Project (DCD: Aug 4, 2025; AZ Big Media: Sep 15, 2025); rezoning application filed with Pinal County ~April 2025. $33B/3 GW ceiling figures publicized. Pinal County Planning & Zoning Commission holds non-voting informational session July 17, 2025.
- 2026 · reported proposed
April 17, 2026: Pinal County land-use committee recommends advancing to full rezoning and site-plan review. No construction authorization granted; comprehensive plan amendment, drainage, flood mitigation, and road improvements still required.
- 2026 · reported proposed
May 2026: Operator announces 80% scale-back after all ~60 public comments opposed the project — revised plan reduces to 11 data centers and a 1 GW energy demand ceiling (down from 59 DCs / 3 GW). Board of Supervisors hearing rescheduled to August 26, 2026.
- 2026-08-28 · reported cancelled
The Pinal County Board of Supervisors voted 4-1 on August 26, 2026 to reject the La Osa Energy Center rezoning request and development plans, after the developer had already scaled the proposal back roughly 80% (from 59 data center buildings and 3 GW of demand to 11 buildings, a 500 MW gas plant, battery storage and a 1 GW cap) in response to opposition over aquifer drawdown and incomplete energy sourcing plans. Supervisor Stephen Miller cast the lone dissent. Recorded as cancelled because the entitlement the project required was denied; Vermaland has not publicly announced a withdrawal or a refiling, so this reflects the county's denial rather than a developer decision.
Sources and attribution
- Land developer Vermaland pitches $33bn data center in Arizona · Data Center Dynamics
- $33 billion data center industrial park coming to Pinal County · AZ Big Media
- Largest proposed data center in Arizona to be scaled back 80% after opposition · KJZZ (Arizona Public Radio)
- Pinal County Advances Vermaland's La Osa Data Center Plan · Hoodline
- $33B Data Center Park Eyed in Arizona · Commercial Property Executive
- Pinal County rejects massive La Osa data center. Residents want more rules for future projects · KJZZ
- Data centers in the Sonoran Desert — update (La Osa rezoning denied August 26, 2026) · Coalition for Sonoran Desert Protection