Licensed lead · not independently verified · dcd-dir-001547

La Osa Data Center Park

reported cancelled

Vermaland LLC

Eloy · Pinal County · Arizona

Capacity not statedSource updated 28 August 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Vermaland LLC
Address and locality
Eloy · Pinal County · Arizona
Lifecycle status
reported cancelled
Facility type
data center
Reported capacity
Not stated
Source freshness
28 August 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001547

What the source record says

Vermaland LLC is a Phoenix-area land developer and land-banking company (CEO Kuldip 'Ken' Verma, founded 2006, controls ~25,000 acres of metro Phoenix land). DCD explicitly noted 'it is unclear whether Vermaland would operate its own data center facilities' — Vermaland plans to sell or rent parcels/buildings to tenants. No end tenants or hyperscaler operators have been named as of July 2026. Original plan: 59 data centers, up to 3 GW capacity ceiling, up to $33B investment ceiling, 3,300-acre site south of Eloy along the Greene Canal. A separate adjacent 1,700-acre parcel already holds Industrial-2 zoning for data centers, gas plants, battery storage, and solar. After strong public opposition (all ~60 public comments opposed), operator announced May 2026 scale-back to 11 data centers and 1 GW ceiling. Board of Supervisors hearing scheduled August 26, 2026; no permits issued as of record date. Site lies adjacent to a Qualified Opportunity Zone (investor tax benefit; not a direct subsidy to Vermaland — no subsidy award confirmed, omitted). Coordinates are approximate (parcel south of Eloy city center along Greene Canal; no precise APN published). $33B investment and all GW figures are announced ceilings, not firm commitments.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · reported proposed

    Vermaland publicly announces La Osa Project (DCD: Aug 4, 2025; AZ Big Media: Sep 15, 2025); rezoning application filed with Pinal County ~April 2025. $33B/3 GW ceiling figures publicized. Pinal County Planning & Zoning Commission holds non-voting informational session July 17, 2025.

    Open cited source →

  2. 2026 · reported proposed

    April 17, 2026: Pinal County land-use committee recommends advancing to full rezoning and site-plan review. No construction authorization granted; comprehensive plan amendment, drainage, flood mitigation, and road improvements still required.

    Open cited source →

  3. 2026 · reported proposed

    May 2026: Operator announces 80% scale-back after all ~60 public comments opposed the project — revised plan reduces to 11 data centers and a 1 GW energy demand ceiling (down from 59 DCs / 3 GW). Board of Supervisors hearing rescheduled to August 26, 2026.

    Open cited source →

  4. 2026-08-28 · reported cancelled

    The Pinal County Board of Supervisors voted 4-1 on August 26, 2026 to reject the La Osa Energy Center rezoning request and development plans, after the developer had already scaled the proposal back roughly 80% (from 59 data center buildings and 3 GW of demand to 11 buildings, a 500 MW gas plant, battery storage and a 1 GW cap) in response to opposition over aquifer drawdown and incomplete energy sourcing plans. Supervisor Stephen Miller cast the lone dissent. Recorded as cancelled because the entitlement the project required was denied; Vermaland has not publicly announced a withdrawal or a refiling, so this reflects the county's denial rather than a developer decision.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID vermaland-la-osa-eloy-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →