Licensed lead · not independently verified · dcd-dir-001508

Turin Hoefler Avenue AI Data Center (former Remington Arms plant, Site C)

reported proposed

Turin Hoefler Avenue LLC

14 Hoefler Avenue · Ilion · Herkimer County · New York

Planned 200 MWSource updated 9 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Turin Hoefler Avenue LLC
Address and locality
14 Hoefler Avenue · Ilion · Herkimer County · New York
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 200 MW (source-reported; boundary not independently verified)
Source freshness
9 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-001508

What the source record says

Redevelopment of the former Remington Arms firearms plant, which ceased production in 2024. WKTV: "Turin Hoefler Avenue LLC submitted a revised application" to the NYSDEC "Brownfield Cleanup Program" in January 2026 for "Site C," a "7.837-acre parcel," with a "250,000-square-foot AI data center" as the intended post-remediation use, at "14 Hoefler Ave., Ilion, NY"; the site has "widespread contamination in the soil, especially with heavy metals like arsenic, lead, and copper at levels above state cleanup standards for commercial use" and "15 vacant industrial buildings dating to the early 1900s," and the developer describes it as a "fossil-fuel-free, 100% electric site." capacityMw.planned = 200 comes from the Rockefeller Institute of Government's tracker entry for the project ("200 MW"), not from WKTV, which states no MW figure. COUNTY DISCREPANCY, recorded honestly: WKTV's article says Oneida County; the Rockefeller Institute says "Village of Ilion, Herkimer County." Ilion is in Herkimer County, so Herkimer is recorded and the WKTV attribution is treated as an error. landAcres = 7.837 is the Brownfield Site C parcel only; trade press describes a larger ~32-acre overall plant site and two 250,000 sq ft buildings, neither of which was verified against a fetched source, so neither is recorded. jobs.permanent is deliberately omitted: the source says only that the project "aims to exceed the 274 positions lost when Remington closed," which is an aspiration, not a count. Confirmed absences (2026-09-09): no investment figure, no water/cooling detail, no utility, and no IDA or PILOT agreement stated in either fetched source. Because the site is fossil-fuel-free and 100% electric per the developer, no on-site generation is recorded.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID turin-hoefler-ilion-ny. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →