Facility snapshot
- Operator as published
- Ercor Triboro LLC (Sansone Group)
- Address and locality
- Jessup / Olyphant · Lackawanna County · Pennsylvania
- Lifecycle status
- reported permitted
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 26 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001501
What the source record says
Jessup/Olyphant border. Converted from a 4-warehouse plan to up to 9 proposed data centers; ~$80M land acquisition; first building targeted 2027. Rezoning/litigation resolved via an Olyphant Borough Council settlement. PPL confirmed a transmission project is being built to serve it but would not name the customer (NDA). One of three competing, previously-untracked proposals in the Lackawanna County cluster (see also Project Gravity and Wildcat Ridge, both added this session). Coordinates are approximate.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- PPL Electric Utilities confirms data centers spurred transmission project in Lackawanna County · WVIA
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- The Times-Tribune — "Firm linked to DeNaples challenges Olyphant over data center zoning" (corroborated by lackawannacounty.com settlement coverage)
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID triboro-industrial-park-jessup-olyphant-lackawanna-county-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.