This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- TPA Group (developer; end tenant undisclosed)
- Address and locality
- Social Circle · Newton County · Georgia
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 6 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001483
What the source record says
Nine buildings, 2.56 million sq ft near I-20/SR-11 intersection. Construction planned to begin 2028; first phase operational target 2031. Formerly filed as Newton County Technology Park; renamed after jurisdictional ambiguity surfaced. Coordinates corrected to Social Circle city centroid (33.6562°N, 83.7182°W); original record had 33.5912°N which is approximately 4.5 miles south of the actual city center per multiple geocoding sources.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-01 · reported proposed
TPA Group filed Development of Regional Impact application with Georgia Department of Community Affairs for nine-building campus near I-20 and SR-11
- 2025-04 · reported proposed
Social Circle Planning Commission recommended approval 3-2 for rezoning from agricultural to light industrial; jurisdictional dispute with Newton County ongoing
Sources and attribution
- TPA Group Plans Massive Newton County Data Center Complex · Bisnow
- Another 2.5 million sq ft data center campus proposed outside Atlanta, Georgia · Data Center Dynamics
- Social Circle officials clear way for second data center · Monroe Local News
- Newton County enacts moratoriums on data centers · The Covington News
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID tpa-social-circle-technology-park-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.