Townsite Solar 2 Boulder City Data Center

reported proposed

Townsite Solar 2 LLC

Boulder City · Clark County · Nevada

Planned 167 MWSource updated 11 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Townsite Solar 2 LLC
Address and locality
Boulder City · Clark County · Nevada
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 167 MW (source-reported; boundary not independently verified)
Source freshness
11 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001482

What the source record says

Proposed as two warehouse-style server buildings plus a 230 kV substation, battery energy storage and perimeter fencing, maximum 40-foot height with dark-sky-compliant lighting. The city page states 200-300 construction/testing jobs and 25-40 permanent technical positions; these ranges are not recorded as point values in the jobs field. Reported as a joint venture of Skylar Capital, Arevon Energy and Overwatch Capital, but that ownership was read only in a search summary and is not asserted here. Status is kept at proposed rather than cancelled: the withdrawal was of the city-land application, not of the project.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-07-06 · reported proposed

    Townsite Solar 2 withdrew its application to build on approximately 88.5 acres of Boulder City-owned land; reporting indicates the developer intends to pursue a nearby federally owned parcel instead.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID townsite-solar-2-boulder-city-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →