- Operator as published
- Townsite Solar 2 LLC
- Address and locality
- Boulder City · Clark County · Nevada
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 167 MW (source-reported; boundary not independently verified)
- Source freshness
- 11 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001482
What the source record says
Proposed as two warehouse-style server buildings plus a 230 kV substation, battery energy storage and perimeter fencing, maximum 40-foot height with dark-sky-compliant lighting. The city page states 200-300 construction/testing jobs and 25-40 permanent technical positions; these ranges are not recorded as point values in the jobs field. Reported as a joint venture of Skylar Capital, Arevon Energy and Overwatch Capital, but that ownership was read only in a search summary and is not asserted here. Status is kept at proposed rather than cancelled: the withdrawal was of the city-land application, not of the project.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-07-06 · reported proposed
Townsite Solar 2 withdrew its application to build on approximately 88.5 acres of Boulder City-owned land; reporting indicates the developer intends to pursue a nearby federally owned parcel instead.
Sources and attribution
- TS2 Data Center Proposal (withdrawn 7.6.2026) - official Boulder City project page · City of Boulder City, Nevada
- Data centers in Nevada - project list (Townsite Solar 2 Boulder City Data Center, Clark County, 170 MW, planned) · Cleanview
- IBLA 2026-0213 / IBLA 2026-0216 stay order (Sept. 1, 2026) - City of Boulder City and Center for Biological Diversity v. BLM, Townsite Data Center amended right-of-way · U.S. Department of the Interior, Interior Board of Land Appeals
- Nevada city dubs itself a test case for data centers on federal lands near communities - 81-acre BLM parcel in Eldorado Valley, BLM approval released June 26 · KJZZ
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID townsite-solar-2-boulder-city-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.