TenKey LandCo Project Lionsgate – Franklin Data Center

reported proposed

TenKey LandCo I LLC

Franklin · Simpson County · Kentucky

Capacity not statedSource updated 24 July 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
TenKey LandCo I LLC
Address and locality
Franklin · Simpson County · Kentucky
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Not stated
Source freshness
24 July 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001437

What the source record says

Site: 421 Steele Road (Steele Road near Exit 2 on I-65), Franklin, Simpson County, KY. Coordinates are approximate for that I-65 exit area within Franklin city limits. Three 200,000 sq ft buildings plus on-site natural gas power generation planned. End hyperscaler not publicly identified; Simpson County Judge-Executive Mason Barnes refused to sign NDA and called the pitch full of red flags. Data center opposition became a factor in May 2026 local primary elections in Simpson County. Fix: investmentUsd corrected from $1.6B to $4.8B — LPM confirms total project is 'nearly $5 billion'; the $1.6B figure in the original record is the per-building cost (each of three 200,000 sq ft facilities costs approximately $1.6B, totaling ~$4.8B).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024 · reported proposed

    TenKey LandCo first approaches Franklin; city council and planning commission vote unanimously to reject proposed zoning change; project internally called Project Lionsgate/Blackjack

  2. 2026-03 · reported proposed

    Franklin Planning & Zoning Commission approves preliminary development plan 3-2 after two prior defeats

    Open cited source →

  3. 2026-04 · reported proposed

    Citizens group files suit to overturn P&Z approval; TenKey's own lawsuit against Simpson County over land use ordinance ongoing

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID tenkey-franklin-ky. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →