This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- TECfusions
- Address and locality
- Upper Burrell Township · Westmoreland County · Pennsylvania
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Operational: 12 MW; Planned: 3,000 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001431
What the source record says
Adaptive reuse of the former Alcoa research and development campus in Upper Burrell, Westmoreland County: 1,395 acres, 3 GW planned over a six-year buildout, with 12 MW described as immediately available in existing buildings. Awarded a $2 million Pennsylvania RACP grant. Investment total not disclosed by the developer.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-01-14 · reported proposed
TECfusions announced acquisition of the 1,395-acre former Alcoa R&D campus and a phased 3 GW AI/HPC campus.
Sources and attribution
- TECfusions Unveils Massive 1400-Acre Data Center Project in Pennsylvania, Revitalizing Former Industrial Plant · TECfusions via PR Newswire
- Data Centers in Pennsylvania — Project List & Locations (TECfusions Keystone Connect, Westmoreland, 3,000 MW planned) · Cleanview
- Upper Burrell residents decry transparency as data center progresses despite moratorium and a lawsuit · PublicSource
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID tecfusions-keystone-connect-upper-burrell-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.