This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Sharon AI + New Era Energy & Digital (joint venture)
- Address and locality
- Ector County · Texas
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 250 MW (source-reported; boundary not independently verified)
- Source freshness
- 24 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001430
What the source record says
Potential to scale beyond 1GW (ceiling, not a confirmed committed figure). Power partners Thunderhead Energy Solutions and Mawgan Capital (behind-the-meter gas generation); GlobeLink providing dark fiber. Phased: first 100MW segment targeted online by December 2026, remaining 150MW roughly 6 months later. Coordinates are approximate (Odessa area).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- TCDC signs LOI to acquire an additional 203 acres for off-grid data center campus in Ector County, Texas · Data Center Dynamics
- Sharon AI: Sharon AI Completes Phase One Engineering for Flagship AI Data Center Campus JV in Texas (Thunderhead Energy Solutions 250MW behind-the-meter agreement, SB6/grid interconnection plan)
- Businesswire: New Era Energy & Digital Secures Full Ownership of Texas Critical Data Centers, Completes 203-Acre Land Acquisition Expanding TCDC Campus in Ector County
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID tcdc-ector-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.