Licensed lead · not independently verified · dcd-dir-001430

Texas Critical Data Centers (TCDC)

reported proposed

Sharon AI + New Era Energy & Digital (joint venture)

Ector County · Texas

Planned 250 MWSource updated 24 July 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Sharon AI + New Era Energy & Digital (joint venture)
Address and locality
Ector County · Texas
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 250 MW (source-reported; boundary not independently verified)
Source freshness
24 July 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001430

What the source record says

Potential to scale beyond 1GW (ceiling, not a confirmed committed figure). Power partners Thunderhead Energy Solutions and Mawgan Capital (behind-the-meter gas generation); GlobeLink providing dark fiber. Phased: first 100MW segment targeted online by December 2026, remaining 150MW roughly 6 months later. Coordinates are approximate (Odessa area).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID tcdc-ector-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →