Project Bunkhouse (Taurus/Digital Realty Data Center Campus)

reported permitted

Taurus Investment Holdings (Taurus DC SPE LLC); to be managed by Digital Realty

Stilesboro · Bartow County · Georgia

Planned 1,830 MWSource updated 26 July 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Taurus Investment Holdings (Taurus DC SPE LLC); to be managed by Digital Realty
Address and locality
Stilesboro · Bartow County · Georgia
Lifecycle status
reported permitted
Facility type
data center
Reported capacity
Planned: 1,830 MW (source-reported; boundary not independently verified)
Source freshness
26 July 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001429

What the source record says

Rezoning approved by county commissioner June 4, 2025 after unanimous planning commission recommendation May 19/20, 2025. 12-building, 8.6M sq ft build-out per DCD; capacity/investment figures ($19B, 1,830MW) are widely reported industry estimates (DCD/CleanView/Server Country) tied to the project, not yet independently verified against a bond-validation dollar figure — flagged as reported-tier confidence on the financial figures even though the rezoning itself is confirmed via primary county action. Bartow County rezoning (8.3M sqft cap, 876.57 ac) confirmed via the county commissioner approval; the ~1,830 MW / ~$19B figures are widely-reported industry estimates, not a permit/bond figure — recorded reported-tier.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-06-04 · reported permitted

    permitted per Bartow County Commissioner rezoning approval, Project Bunkhouse (Taurus DC SPE LLC)

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID taurus-digital-realty-project-bunkhouse-stilesboro-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →