Licensed lead · not independently verified · dcd-dir-001427

Tallassee 1852 Mill Data Center Proposal

reported cancelled

Undisclosed private developers

Tallassee · Elmore County · Alabama

Planned 10 MWSource updated 15 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Undisclosed private developers
Address and locality
Tallassee · Elmore County · Alabama
Lifecycle status
reported cancelled
Facility type
data center
Reported capacity
Planned: 10 MW (source-reported; boundary not independently verified)
Source freshness
15 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001427

What the source record says

Site is the shell of the historic 1852 textile mill on the west side of the Tallapoosa River, adjacent to Alabama Power's Thurlow Dam; the property is owned by the Tallassee Redevelopment Authority. Capacity reporting differs: WSFA described a 10 MW project that could grow to 20 MW, while the Tallassee Times reported the developers described a 20 MW facility - the conservative 10 MW figure is recorded. The developers, described as entrepreneurs based in South Carolina and Florida, were not named in either account, so the operator field is a placeholder rather than a verified entity. Developers claimed 15-30 permanent positions. Coordinate is the OpenStreetMap "Tallassee Mills" feature.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-04 · reported proposed

    Two businessmen expressed interest in buying the 1852 mill property from the Tallassee Redevelopment Authority and converting the mill shell into a data center; the proposal surfaced publicly about two weeks before April 29, 2026.

    Open cited source →

  2. 2026-05-18 · reported cancelled

    Mayor Joey Wiginton and the Tallassee City Council took the data center off the table, with the mayor saying "we don't understand enough about it to make a good decision on it"; he added that developer interest had also diminished.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID tallassee-mill-data-center-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →