Licensed lead · not independently verified · dcd-dir-001417

T5@Minneapolis (1001 Third Avenue South)

reported operational

T5 Data Centers (asset owned by a Cloud Capital / Arcapita joint venture since January 2026)

1001 3rd Avenue South · Minneapolis · Hennepin County · Minnesota · 55404

Planned 31 MWOperational 21 MWSource updated 18 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
T5 Data Centers (asset owned by a Cloud Capital / Arcapita joint venture since January 2026)
Address and locality
1001 3rd Avenue South · Minneapolis · Hennepin County · Minnesota · 55404
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 21 MW; Planned: 31 MW (source-reported; boundary not independently verified)
Source freshness
18 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001417

What the source record says

PeeringDB registers "T5@Minneapolis" (T5 Data Centers) at 1001 3rd Ave South, Minneapolis 55404, with coordinates within ~10 m of the OSM "Sleep Number Building" polygon. Cloud Capital and Arcapita announced on 2026-01-13/14 the acquisition of a 21 MW Minneapolis data center "primarily leased on a long-term basis" to "a leading provider of sovereign AI and cloud inferencing solutions", plus a "planned 10 MW expansion" to 31 MW; neither release names a street address, so the identification of that asset with this building is reported, not confirmed by the acquirers. aiClassification set from the acquirers' own description of the anchor tenant's workload.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-01-13 · reported operational

    Cloud Capital and Arcapita announced the acquisition of an operating 21 MW Minneapolis data center with a planned 10 MW expansion.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID t5-minneapolis-1001-third-avenue-mn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →