Facility snapshot
- Operator as published
- Swarm Systems
- Address and locality
- Marshalltown · Marshall County · Iowa
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 16 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001389
What the source record says
Building size is reported inconsistently: the Times Republican account of the Aug. 26, 2026 council presentation says 125,000 sq ft, while Business Record reports 150,000 sq ft. Jobs were described as a 50-60 permanent range; the lower bound is recorded. No MW capacity was stated. Coordinates are approximate — the point sits at the JBS Marshalltown industrial site, next to which the Edgewood Industrial Park city-owned parcels lie; no specific parcel has been identified publicly.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-08-26 · reported proposed
Swarm Systems CEO Amir Atefi presented to the Marshalltown City Council seeking a purchase contract for 21 acres of city-owned land in the Edgewood Industrial Park to conduct due diligence; the council passed a 120-day data center moratorium the same night.
Sources and attribution
- City council passes second and third readings of data center moratorium, hears from prospective developer · Times Republican
- Iowa communities grapple with regulating data centers as development spreads · Business Record
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID swarm-systems-marshalltown-ia. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.