Planned 1,200 MWSource updated 10 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Stonebridge (via Florida Ecopark LLC; end tenant undisclosed)
Address and locality
Fort Meade · Polk County · Florida
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 1,200 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001373

What the source record says

1,300-acre former phosphate mine site; 200-acre data center footprint. 20-year development agreement approved by Fort Meade City Commission approximately April 15, 2026. Requires 1.2 GW of electricity. No identified lessee or buyer publicly disclosed. Water use reduced in plans from 140,000 to 50,000 gallons daily; Southwest Florida Water Management District approval pending separately. Florida SB 484 signed May 2026 added new state-level data center siting requirements. Coordinates are Fort Meade city centroid; actual site is former phosphate mine outside city limits. Re-checked 2026-09-10: status unchanged at 'proposed'. The 20-year development agreement was unanimously approved by Fort Meade commissioners (2026-04-15), but two resident lawsuits filed 2026-05-14 seek to void that approval and block construction-permit issuance (trial scheduled November 2027), and a recall effort against three commissioners is itself now in litigation (Commissioner Matthew Taylor sued 2026-09-09 to stop the recall). No groundbreaking reported. Exact street address still not found in public reporting (site described only as 'west of US-98' on former phosphate-mine land) - missing:address could not be filled this pass.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-03 · reported proposed

    Stonebridge/Florida Ecopark LLC proposed development on 1,300-acre former phosphate mine; data center footprint 200 acres

  2. 2026-04-08 · reported proposed

    Fort Meade Planning Commission voted unanimously to recommend approval of 20-year development agreement

    Open cited source →

  3. 2026-04-15 · reported proposed

    Fort Meade City Commission approved 20-year development agreement despite near-unanimous public opposition; outstanding water use and grid interconnection permits required before construction can proceed

    Open cited source →

  4. 2026-04-17 · reported proposed

    Florida Commerce Secretary Alex Kelly called project fundamentally flawed over water, energy, and transportation risks in letter to Fort Meade

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID stonebridge-fort-meade-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →