Licensed lead · not independently verified · dcd-dir-001367

Stargate The Barn Campus

reported under construction

OpenAI / Oracle / Related Digital

Saline Township · Washtenaw County · Michigan

Planned 1,400 MWSource updated 14 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
OpenAI / Oracle / Related Digital
Address and locality
Saline Township · Washtenaw County · Michigan
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 1,400 MW (source-reported; boundary not independently verified)
Source freshness
14 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001367

What the source record says

Status re-check, NO change: independently confirmed 'under_construction' - the Michigan Data Center Tracker (baldorilaw.com/resources/michigan-data-center-tracker, retrieved 2026-09-09) lists 'The Barn' campus in Saline Township as 'Under construction · 2026-04', matching the record. subsidies left empty: no site-specific incentive award was found in any fetched source; Michigan's 2024 statutory data center sales/use tax exemptions may apply but no fetched page ties an award to this site, and the MPSC conditions are ratepayer protections, not subsidies.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-10 · reported proposed

    $16B campus on 250 acres SW of Ann Arbor; township initially voted against rezoning; resolved via lawsuit settlement

    Open cited source →

  2. 2026-06-01 · reported under construction

    Official groundbreaking with Gov. Whitmer; 3 buildings of 550,000 sq ft each; Oracle, OpenAI, Related Digital; first steel beams installed March 2026

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID stargate-saline-township-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →