Licensed lead · not independently verified · dcd-dir-001319

Silicon Foundation Warwood Data Center and Energy Campus (former Centre Foundry)

reported proposed

Silicon Foundation Energy

74 Warwood Avenue · Wheeling · Ohio County · West Virginia · 26003

Planned 100 MWSource updated 15 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Silicon Foundation Energy
Address and locality
74 Warwood Avenue · Wheeling · Ohio County · West Virginia · 26003
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 100 MW (source-reported; boundary not independently verified)
Source freshness
15 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001319

What the source record says

Phased plan: Phase 1 a 10-MW modular data center system with battery energy storage targeted for late 2026; Phase 2 expansion to 20–30 MW (reported as "as much as 100 megawatts" in 2027 by River News); Phase 3 a 100-MW regional compute hub. capacityMw.planned records the 100-MW full build-out. The foundry operated for more than 180 years until it closed in 2023. Under HB 2014 the project is exempt from county/municipal zoning and building permitting. Coordinates are the OSM address point for 74 Warwood Avenue, not a parcel-confirmed footprint.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-06-22 · reported proposed

    Silicon Foundation purchased the ~15-acre former Centre Foundry property at 74 Warwood Avenue and announced a phased data center and energy campus.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID silicon-foundation-warwood-wheeling-ohio-county-wv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →