Licensed lead · not independently verified · dcd-dir-001314

Servistar Realties Westfield Data Center Campus

reported proposed

Servistar Realties

Westfield · Hampden County · Massachusetts

Planned 42 MWSource updated 26 July 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Servistar Realties
Address and locality
Westfield · Hampden County · Massachusetts
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 42 MW (source-reported; boundary not independently verified)
Source freshness
26 July 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001314

What the source record says

Would-be first Massachusetts hyperscale data center: 10-building, 2.7M sq ft campus over a long buildout (191/199 Servistar Industrial Way). Tax exemption secured 2024. Status is early and thin — no confirmed groundbreaking; conflicting signals on whether the project is still active.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2021 · reported proposed

    Local approval 2021, tax exemption law 2024

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID servistar-westfield-ma. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →