Wixom Road Data Center Campus

reported proposed

Wixom Industrial One / Sansone Group

30625 S. Wixom Road · Wixom · Oakland County · Michigan

Capacity not statedSource updated 9 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Wixom Industrial One / Sansone Group
Address and locality
30625 S. Wixom Road · Wixom · Oakland County · Michigan
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001292

What the source record says

Three-building complex, each building stated at more than 200,000 sq ft for a total of more than 519,000 sq ft, on vacant light-industrial land. Status is 'proposed' and remains blocked by the municipal moratorium — no site-plan or rezoning approval is recorded. Capacity: NO megawatt figure is stated in either source; capacityMw is therefore omitted rather than inferred from square footage. Water use is not quantified in the sources. Investment figure not stated. The source notes the site sits near a DTE Energy transmission line with natural gas service available, but no interconnection or generation arrangement is described, so energy is left unset. Coordinates from the US Census geocoder for the street address named in the source; parcel boundary not confirmed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-03 · reported proposed

    Wixom enacted a six-month data-center moratorium running through August 2026.

    Open cited source →

  2. 2026-07 · reported proposed

    City council unanimously voted down the developer's application to lift the moratorium early; a separate ordinance setting future data-center rules was postponed.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID sansone-wixom-road-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.