Licensed lead · not independently verified · dcd-dir-001242

Gibraltar Data Center (former McLouth Steel site)

reported proposed

Raeden (with Cal Realty / Ferragon Corp.)

27800 W. Jefferson Avenue · Gibraltar · Wayne County · Michigan

Planned 100 MWSource updated 9 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Raeden (with Cal Realty / Ferragon Corp.)
Address and locality
27800 W. Jefferson Avenue · Gibraltar · Wayne County · Michigan
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 100 MW (source-reported; boundary not independently verified)
Source freshness
9 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001242

What the source record says

100 MW proposal on the former McLouth Steel plant site (operated from the 1950s to 1996, now a steel processing site) at 27800 W. Jefferson Ave., with an adjacent Superfund property at 28000 W. Jefferson. Status remains 'proposed', not 'cancelled': the application is blocked by the moratorium and is the subject of active litigation, not a denial. CONFIRMED ABSENCES: no acreage, investment figure, water figure, or job count is stated in either source. The '80,000 households' comparison is the source's characterisation of the 100 MW draw, not an additional measured figure. Coordinates are the US Census geocoder's match for the street address named in the source; the parcel is not confirmed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-02 · reported proposed

    Application submitted to the city; the city asked for additional detail.

    Open cited source →

  2. 2026-03 · reported proposed

    City council passed a one-year data-center moratorium on 2026-03-09, halting consideration.

    Open cited source →

  3. 2026-08 · reported proposed

    Developers filed suit on 2026-08-17 seeking a declaration that the moratorium is invalid and an order compelling the city to approve the plans.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID raeden-gibraltar-mclouth-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →