This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- PBA Holdings (end tenant undisclosed)
- Address and locality
- Loxahatchee · Palm Beach County · Florida
- Lifecycle status
- reported cancelled
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 10 September 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001166
What the source record says
202 acres on Southern Boulevard, approximately 3.7 miles west of Seminole Pratt Whitney Road, Loxahatchee. Phillips Inc. and TPA Group involved in development under PBA Holdings. Original 2016 zoning covered 206,000 sq ft; current application for 1.79M sq ft data center plus 1.9M sq ft warehouse. MW capacity not disclosed. End user likely a major hyperscaler but not publicly identified. Coordinates are approximate site location. Re-checked 2026-09-10: cancelled status confirmed. Palm Beach County commissioners denied the development order amendment 5-1 on 2026-07-15 ('without prejudice', meaning the developer could refile); a previously approved warehouse/data-center plan for the same site under the separate Central Park Commerce Center development remains in place.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-12 · reported proposed
Palm Beach County Zoning Commission recommended approval of revised 3.7M sq ft campus application
- 2025-12-10 · reported proposed
County commissioners voted 7-0 to postpone decision after hours of public opposition; additional impact studies required
- 2026-04 · reported proposed
Second postponement at developer's request; vote rescheduled to July 15, 2026
- 2026-07-16 · reported cancelled
Palm Beach County Board of County Commissioners denied the Project Tango hyperscale-data-center development-order amendment on a 5-1 vote on 2026-07-16, after a 12-hour hearing with overflow crowds. A smaller data-center use (~206,000 sq ft, alongside ~1.8M sq ft of warehouse) remains approved under the 2016 Central Park Commerce Center zoning at the 202-acre site (20125 Southern Blvd), where construction continues under that prior approval.
Sources and attribution
- 3.7 million sq ft data center campus gets initial OK from officials in Florida · Data Center Dynamics
- Palm Beach County postpones 200-acre Project Tango AI data center after community outrage · WLRN
- 'Not compatible': Palm Beach County rejects controversial Project Tango AI data center · WLRN
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID project-tango-loxahatchee-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.