Facility snapshot
- Operator as published
- Undisclosed end user (site pursued by Choose Columbus / Development Authority of Columbus)
- Address and locality
- Columbus · Muscogee County · Georgia
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 600 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001164
What the source record says
865 acres in northeast Muscogee County (Upatoi), $5.18 billion, 600 MW — a draw exceeding current power usage for all of Columbus. Columbus Water Works is named as the treated-water supplier. The overlay-district vote is a zoning tool, not project approval. Coordinates are approximate to Upatoi.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-06-16 · reported proposed
Columbus Council voted 6-2 to create a technology overlay district in the Unified Development Ordinance. A separate rezoning request for the site has not been submitted, and a DRI review is still required.
Sources and attribution
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID project-ruby-upatoi-muscogee-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.