Percheron Data Center

reported under construction

Rowan Green Data (DBA Rowan Digital Infrastructure)

Boardman area (Tower Road) · Morrow County · Oregon

Planned 300 MWSource updated 10 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Rowan Green Data (DBA Rowan Digital Infrastructure)
Address and locality
Boardman area (Tower Road) · Morrow County · Oregon
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001117

What the source record says

Rowan Digital Infrastructure (formerly Rowan Green Data, a Quinbrook/Birch Infrastructure JV) is developing a single unified campus on a 275-acre parcel in Morrow County, OR: four buildings totaling 1.125M sq ft, 300MW planned capacity by mid-2027. County approved rezoning Sept 2023 (East Oregonian, DCD). This is the canonical record for the campus; osm_ids 1501824327/328/329 are near-identical coordinates (within ~0.2km) almost certainly representing OSM nodes for the same single campus/buildings and are dropped as duplicates. Capacity re-sourced 2026-08-08: Rowan's own portfolio page states "300 MW" on "275AC" with phased buildout completing by 2030. Public-reception check (2026-09-10): Checked baxtel.com's project page (2026-09-10). Important correction: a Gov. Tina Kotek data-center land-sale cancellation reported elsewhere concerns a DIFFERENT project near Salem, OR (developer Verrus) -- NOT Percheron/Morrow County -- and must not be attributed to this record. No community reaction, hearing, or official statement specific to Percheron/Boardman was found; the page states only that the project is under construction with planned 2027 completion.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID percheron-data-center-or. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →