Licensed lead · not independently verified · dcd-dir-001115

Bedington Campus

reported proposed

Penzance Management

Berkeley County · West Virginia

Planned 600 MWSource updated 15 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Penzance Management
Address and locality
Berkeley County · West Virginia
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 600 MW (source-reported; boundary not independently verified)
Source freshness
15 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001115

What the source record says

Falling Waters District, Berkeley County WV eastern panhandle — adjacent to Maryland border. 1.9 million sq ft at full buildout. Penzance (DC/NoVA developer) is also developing a Fairfax County VA campus reportedly pre-leased to Amazon. Coordinates approximate for Falling Waters area. Re-checked 2026-09-10: status unchanged (proposed). Most recent coverage found (wvgazettemail article, published 2026-02-28, updated 2026-09-04) reports no groundbreaking, permit, or construction start yet; a tenant announcement was still described as pending later in 2026. address remains unresolved: checked governor.wv.gov, WV Division of Economic Development, SEDC, and county/trade press coverage — all describe only '548 acres in the Falling Waters District of Berkeley County' with no house number or parcel ID; Berkeley County GIS/assessor records were not reachable this session, so location.street is left unfilled rather than approximated. CONFIRMED ABSENCE (2026-09-10): the Governor's office states explicitly that no state funding was used for Bedington Campus. HB 2014's revenue-sharing formula (50% Personal Income Tax Reduction Fund / 30% host county / 10% all counties per capita / 5% Electric Grid Stabilization and Security Fund / 5% Economic Enhancement Grant Program) is a distribution of the taxes the facility itself will generate, not an incentive granted to the facility, so it is not recorded as a subsidy. No county-level PILOT or abatement agreement was found in sources checked this session (governor.wv.gov, WV DED, SEDC).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-02 · reported proposed

    Announced February 26, 2026 by Governor Morrisey; designated West Virginia's first High Impact Intelligence Center (enabling bypass of certain local zoning constraints); site preparation underway as of March 2026. No state funding involved.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID penzance-bedington-berkeley-county-wv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →