Facility snapshot
- Operator as published
- Parkway Gravel Inc.
- Address and locality
- St. Georges · New Castle County · Delaware
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 300 MW (source-reported; boundary not independently verified)
- Source freshness
- 12 September 2026
- Location precision
- approximate
- Source confidence
- rumored
- Stable directory ID
dcd-dir-001105
What the source record says
Confidence is 'rumored' rather than 'reported' because sources disagree on whether the ultimate use will be a data center: county filings and press describe a mixed-use industrial park (distribution/fulfillment/warehouse) for which Delaware zoning also happens to permit data centers, and coverage attributes to the developer's engineering firm only that 'the developer may be planning to build a data center' — not a confirmed data-center project. A Delmarva Power internal project list obtained via FOIA (Technical.ly, sourceIndex 2) separately lists a 300 MW 'St. Georges/Frightland Area' project 'pending cluster study analysis'; this record treats it as the same site given the shared name/geography, though the FOIA-based list does not itself name Parkway Gravel Inc., so treat the capacityMw.planned=300 figure with that caveat. Square footage progression (2.5M sq ft → 3.2M sq ft) is not recorded in a dedicated field since it describes the broader mixed-use park, not a confirmed data-center footprint. Location precision is approximate: geocoded to the unincorporated place of St. Georges, DE (OSM); some press coverage instead characterizes the site as 'in Middletown' given proximity. The specific parcel south of the C&D Canal off US Route 13 did not resolve via geocoding.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-11 · reported proposed
Revised site plan filed for St. Georges Business Park & Lighthouse Farms at 3.2 million sq ft (up from an original 2.5 million sq ft / three distribution buildings + 150 homes). The developer's engineering firm, Verdantas, told the county the zoning allows 'distribution centers, fulfillment centers, truck terminals, warehouses, and data centers' on the parcel.
Sources and attribution
- Two New Castle County industrial projects may become data centers · Spotlight Delaware
- After months of debate, New Castle County Council agrees to regulate the data center industry · Spotlight Delaware
- Newly public records reveal four pending Delaware data center projects · Technical.ly
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID parkway-gravel-st-georges-de. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.