Panther Creek HPC/AI Data Center Campus

reported under construction

Bitfarms Ltd.

Nesquehoning · Carbon County · Pennsylvania

Planned 350 MWSource updated 12 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Bitfarms Ltd.
Address and locality
Nesquehoning · Carbon County · Pennsylvania
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 350 MW (source-reported; boundary not independently verified)
Source freshness
12 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-001104

What the source record says

An HPC/AI data center campus in pre-construction design at the Panther Creek waste-coal power plant site in Nesquehoning, Carbon County, with T5 Data Centers providing pre-construction design, development-approval and construction guidance. This is a separate data_center record from the already-tracked Panther Creek plant / crypto-mining operation at the same site, following the same convention as the split Homer City generation and campus records. Trade reports of a 350 MW firm power contract by 2028 (scalable toward 500 MW+) and of a special exception permit from the Nesquehoning Planning Commission were not confirmed in the sources cited here, so capacityMw and a 'permitted' status are omitted.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-08-05 · reported proposed

    Bitfarms announced a partnership with T5 Data Centers for pre-construction design planning and development approvals for an HPC/AI data center at the Panther Creek campus.

    Open cited source →

  2. 2026-08-31 · reported under construction

    Bitfarms converted its Macquarie facility into $300M of project financing on October 10, 2025 and drew an additional $50M specifically to fund civil works and substation construction at Panther Creek, with groundbreaking and commencement of civil works in Q4 2025 and Phase 1 energization expected by year-end 2026. The Nesquehoning Planning Commission granted a special exception permit on February 24, 2026 for Phase 1 — four buildings totalling 315,000 sq ft on 90 acres.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID panther-creek-hpc-ai-campus-nesquehoning-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →