This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Oklahoma AI Ventures LLC (Jericho Energy Ventures / Comstock Holding Companies JV)
- Address and locality
- Perry · Noble County · Oklahoma
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 2 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001087
What the source record says
Flagship campus of the Jericho Energy Ventures / Comstock 50-50 joint venture (Oklahoma AI Ventures LLC), sited on Jericho's ~18,000-acre subsurface portfolio with roughly 60 miles of gas, power and water infrastructure between Oklahoma City and Tulsa. The 8-K names Pawnee and Noble counties and states upwards of 4,000 acres secured for development options; no capacity figure is given by the developer, so none is recorded here. Coordinates are approximate to Perry, the Noble County seat.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-06-10 · reported proposed
Oklahoma AI Ventures LLC joint venture formed; land assemblage under way in Pawnee and Noble counties.
Sources and attribution
- AI Data Centers — Black Bear campus · Jericho Energy Ventures
- Comstock Holding Companies Form 8-K exhibit — Oklahoma AI Ventures JV with Jericho · U.S. Securities and Exchange Commission
- Oklahoma Data Center Map — Black Bear AI Data Center Campus, Perry · dcmap.us
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID oklahoma-ai-ventures-black-bear-noble-county-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.