Licensed lead · not independently verified · dcd-dir-001084

Oakland University Campus Computing Facility

reported proposed

Fairmount Properties (with Oakland University)

Auburn Hills · Oakland County · Michigan

Planned 26 MWSource updated 9 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Fairmount Properties (with Oakland University)
Address and locality
Auburn Hills · Oakland County · Michigan
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 26 MW (source-reported; boundary not independently verified)
Source freshness
9 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-001084

What the source record says

Proposed shared university/industry colocation facility on OU's campus (Auburn Hills/Rochester border); site shifted from Parking Lot 35 to Parking Lot 37 to increase distance from a campus hall, a nature preserve, and a Native American heritage site. Cleveland-based Fairmount Properties funds construction, operations, and eventual decommissioning; OU pays nothing and gains an 8x expansion of its own computing capacity. Board of Trustees voted 7-0-1 to proceed into due diligence, design, and construction phases (June 2026); published timeline has due diligence running Oct 2026-June 2027, design July 2027-Fall 2028. Coordinates are an approximate campus-area estimate, not parcel-geocoded. Status re-check, NO change: the only 2026 milestone on the university's own timeline is a Board of Trustees authorization to proceed into due diligence and design (June 2026, already before the record's 2026-08-08 basis). A governing-board authorization is not a municipal permit and no construction start is claimed, so the record stays 'proposed'.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID oakland-university-computing-auburn-hills-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections