PORTS-Pike Technology Campus

reported under construction

SB Energy

Piketon · Pike County · Ohio

Planned 10,000 MWSource updated 1 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
SB Energy
Address and locality
Piketon · Pike County · Ohio
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 10,000 MW (source-reported; boundary not independently verified)
Source freshness
1 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-001043

What the source record says

Officially "PORTS-Pike Technology Campus"; formerly tracked under the pre-announcement Ohio entity New Day Data Centers LLC, a name that appears nowhere in the SEC S-1 or SB Energy’s own announcements. Developer/operator is SB Energy (SoftBank-controlled); the DOE lease was signed 2026-02-26 by its subsidiary Pike County Portsmouth DC LLC. CAPACITY - three distinct figures that must not be conflated: 8.0 GW-IT of contracted compute (8,024 MW-IT; NVIDIA guarantees the initial 4.25 GW-IT with an option on the remaining 3.78 GW-IT), 10 GW of gross power load (the capacityMw.planned value here), and 9.2 GW of new gas generation. OFFTAKE: on 2026-08-17 SB Energy subsidiaries signed 17 twenty-year triple-net leases with OpenAI, with rent commencement conditioned on interconnection and generation being available; NVIDIA provided a residual-value guaranty capped at $105B and separately bought $1.5B of non-voting stock. LAND: landAcres is intentionally omitted - the DOE lease covers 189 acres (Batch 1) on which "one data center building is expected to be constructed", while the S-1 places the buildings "across several thousand acres of private property"; the widely-cited 3,700/3,777 acres is the whole federal reservation, which also hosts the separately tracked Oklo Aurora project, Centrus and the DUF6 plant. INVESTMENT: investmentUsd intentionally omitted - $10B (DOE, March) and $30-40B (project site) describe the same ~800 MW first phase and cannot both be right, the $67.2B total appears only as one trade outlet’s unattributed rollup, and the S-1 states no total capex. SUBSIDIES: none awarded - the Ohio Tax Credit Authority minutes record no award, no JobsOhio award was found, and Ohio paused new data-centre tax exemptions in May 2026; a county PILOT is under negotiation because the leased federal land yields no property tax. STATUS: early civil works began after the 2026-03-20 groundbreaking, though the S-1 lists construction as not started, with first capacity in 2028 and full buildout 2032. Distinct from oklo-aurora-pike-county-oh on the same broader site - do not merge or double-count.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-03-20 · reported under construction

    Groundbreaking 2026-03-20 on the former Portsmouth Gaseous Diffusion Plant site; 10 GW gross power load, 9.2 GW of new natural gas generation.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID new-day-ports-technology-campus-piketon-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →