Licensed lead · not independently verified · dcd-dir-001031

NE Edge Millstone Nuclear Data Center

reported cancelled

NE Edge

Waterford · New London County · Connecticut

Planned 300 MWSource updated 6 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
NE Edge
Address and locality
Waterford · New London County · Connecticut
Lifecycle status
reported cancelled
Facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified)
Source freshness
6 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001031

What the source record says

Connecticut has no hyperscale data centers. Governor Lamont's administration has since required new data centers to bring their own power generation rather than draw from the grid, and has proposed a PILOT framework in lieu of the prior tax incentive structure. Only one company (Cigna) used Connecticut's data center tax incentive since its enactment.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023-01 · reported proposed

    NE Edge presents hyperscale data center plan to Waterford town leaders; two 2-story facilities, 1.5M sq ft, on less than 5% of Millstone's 526-acre site

    Open cited source →

  2. 2023-03 · reported proposed

    Host fee agreement signed between NE Edge-Waterford LLC, Dominion Energy, and Town of Waterford ($231M over 30 years)

    Open cited source →

  3. 2024-01 · reported cancelled

    CT Siting Council denies Dominion's petition for exemption from state review. Host fee agreement terminated by default.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID ne-edge-millstone-ct. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →