Nautilus Data Technologies Data Center (Former Great Northern Paper Mill / One North)

reported cancelled

Nautilus Data Technologies

1 Katahdin Ave · Millinocket · Penobscot County · Maine

Planned 60 MWSource updated 12 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Nautilus Data Technologies
Address and locality
1 Katahdin Ave · Millinocket · Penobscot County · Maine
Lifecycle status
reported cancelled
Facility type
data center
Reported capacity
Planned: 60 MW (source-reported; boundary not independently verified)
Source freshness
12 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-001026

What the source record says

Site address (1 Katahdin Ave) and 1,400-acre complex size independently confirmed by EPA (sourceIndex 2, a Brownfields cleanup release, not about this project). No source found specifies exactly which 13 acres of the complex were slated for the data center, so precision is approximate rather than exact. The mill site has since been rebranded 'One North' by nonprofit redeveloper Our Katahdin and is pursuing smaller-footprint tenants (biofuels, aquaculture) instead. Coordinates: OpenStreetMap Nominatim building match 'Great Northern Paper Administration Building' at this address (way/355222391), cross-checked against the US Census geocoder (onelineaddress) which landed ~230m away on the same site; OSM building match used per contract preference.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2021-06 · reported proposed

    Announced by Nautilus Data Technologies: $300M investment, 60MW planned capacity, on a 13-acre parcel within the 1,400-acre former Great Northern Paper Co. site. Initial named tenants: Maine State Chamber of Commerce and Jackson Laboratory.

    Open cited source →

  2. 2025-04 · reported cancelled

    Reported dead by One Katahdin's mill-site redevelopment director; Nautilus could not secure the AI customer it wanted because the site could not deliver enough power.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID nautilus-millinocket-me. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.