Licensed lead · not independently verified · dcd-dir-001009

Steward Drive Data Center (Rochelle)

reported cancelled

Midwest Power Investors LLC (LFF Industrial)

Steward Drive · Rochelle · Ogle County · Illinois

Planned 150 MWSource updated 12 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Midwest Power Investors LLC (LFF Industrial)
Address and locality
Steward Drive · Rochelle · Ogle County · Illinois
Lifecycle status
reported cancelled
Facility type
data center
Reported capacity
Planned: 150 MW (source-reported; boundary not independently verified)
Source freshness
12 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001009

What the source record says

Proposed along Steward Drive in Rochelle, which operates its own municipal electric utility. The initial phase would have required at least 48 MW, with later phases expanding to about 150 MW; the recorded planned capacity is the full-build figure. The mayor cited projected Illinois capacity shortfalls from 2029.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-09-12 · reported cancelled

    Rochelle City Council rejected the development agreement 0-7 on 27 April 2026 after tabling it in March.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID midwest-power-investors-rochelle-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →