Facility snapshot
- Operator as published
- Menlo Digital
- Address and locality
- 2255 Jamestown Drive · Petersburg · Virginia
- Lifecycle status
- reported permitted
- Facility type
- data center
- Reported capacity
- Planned: 104 MW (source-reported; boundary not independently verified)
- Source freshness
- 9 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000921
What the source record says
Four-building campus totalling roughly 1.2 million sq ft on 74 acres, served by a planned 300 MW substation; the 104 MW figure is the reported supported IT load at full buildout, not the substation rating. Menlo's own site markets the project as 'Richmond Virginia Data Center'. Coordinates are an approximate geocode of the cited street address.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-07-21 · reported permitted
Rezoned by Petersburg City Council in 2023 with subsequent approvals. A site plan has been submitted but not yet approved — comments and corrections on the most recent submission were returned in late April 2026 and an updated plan had not been resubmitted as of the reporting date.
Sources and attribution
- Documents reveal details on several data center projects in Petersburg's pipeline (archived) · Richmond BizSense
- Navigating Virginia's Data Center Boom: Policy Shifts, Local Projects, and Future Challenges · Data Center Frontier
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID menlo-digital-jamestown-drive-petersburg-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.