This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- MCD 7 LLC
- Address and locality
- Limerick Township · Montgomery County · Pennsylvania
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 750 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000916
What the source record says
Eight server buildings totaling about 1.4 million sq ft on roughly 192 acres across from the Philadelphia Premium Outlets, replacing a previously approved warehouse complex; projected to generate $10–20 million in tax revenue, primarily to the Spring-Ford School District. Trade press reports the project under the name 'Project Laurel' and places it within a mile of Constellation's Limerick nuclear station; neither detail was confirmed in the source cited here. The eventual occupant is under a non-disclosure agreement.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-01-16 · reported proposed
Limerick Township planning commission received a first look at the 1.4 million sq ft, eight-building proposal.
Sources and attribution
- Limerick gets first look at 1.4M-square-foot data center proposal · Suburban Realtors Alliance
- Limerick Board of Supervisors vote to send a letter opposing a land swap for proposed data center · 6abc Philadelphia (WPVI)
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID mcd7-limerick-township-montgomery-county-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.