This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- LPI Group
- Address and locality
- Casa Grande · Pinal County · Arizona
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 400 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000874
What the source record says
Unincorporated Pinal County at the southwest corner of Selma Highway and Midway Road, roughly two miles south of the Casa Grande city limits but inside its planning area. The applicant projects about 225 permanent jobs at an average salary near $93,000 and $150 million in annual utility spend at full build-out. Reported acreage differs between sources (215 acres in the Pinal Post account, 294 acres in a same-day Pinal Central report); the 215-acre figure matches the comprehensive plan amendment as described. Capacity in MW has not been publicly stated.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-11-19 · reported proposed
Pinal County Board of Supervisors voted 5-0 to approve the comprehensive plan amendment changing 215 acres from Moderate Low Density Residential to Employment. Rezoning approval is still required before construction.
Sources and attribution
- Project Midway Data Center Approved by Pinal County Supervisors · Pinal Post
- Data Center Hearing: Project Midway Rezoning Set for July 16 · Pinal Post
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID lpi-group-project-midway-casa-grande-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.