Facility snapshot
- Operator as published
- Logistix Property Group
- Address and locality
- 1380 University Boulevard · Hamilton · Butler County · Ohio
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 2 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000871
What the source record says
Site scaled and moved twice: original Nov 2024 plan was ~15 acres/155,000 sq ft/~$15M/~15 MW at University Commerce Park; by fall 2025 it had grown to a 29.2-acre city-owned parcel at 1380 University Boulevard, 320,000 sq ft, 200+ MW, $1B+ (Wharton Equity Partners partnership). No single capacityMw figure is asserted here — disclosed MW figures range from an original 15 MW up to a 240 MW request that a Jan 2026 city feasibility study found undeliverable (only 45 MW available within 24 months). Project has been paused since January 2026 pending resolution of that power-delivery gap; most recent confirmed reporting (June 2026) states it remains paused, with no resumption, cancellation, or construction start found. No AI/HPC-specific marketing language found in any source, so aiClassification is omitted. Coordinates are the Hamilton, OH city-area centroid, not an independently geocoded parcel point for 1380 University Boulevard.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024-11 · reported proposed
Hamilton City Council approved sale of ~15 acres (University Commerce Park, Riverside neighborhood) to Logistix for $65,000; original plan ~155,000 sq ft data center + 95,000 sq ft substation, ~$15M investment, ~15 MW.
- 2025-10 · reported proposed
Project rescaled: Logistix partnered with Wharton Equity Partners and moved to a 29.2-acre city-owned parcel at 1380 University Boulevard, targeting 320,000 sq ft, 200+ MW (up from an earlier 80 MW plan), $1B+ investment, and 100+ jobs; groundbreaking targeted January 2026.
- 2026-01 · reported proposed
City-commissioned feasibility study found the grid can deliver only 45 MW within 24 months against Logistix's 240 MW request; Logistix asked the city to pause the study, stating no decision had been made on the project.
- 2026-06 · reported proposed
Butler County Commissioners' data-center moratorium coverage (moratorium covers only unincorporated townships, not the City of Hamilton) confirms the Hamilton project has been on pause since January 2026, with no resumption, cancellation, or construction start confirmed since.
Sources and attribution
- Hamilton OKs plan for data center project in Riverside neighborhood · Journal-News
- Hamilton Innovation Center — project page · Ware Malcomb
- $1B hyperscale data center could break ground in City of Hamilton in 2026 · Butler County Foundation for Advancement
- Plans for $1 billion Cincinnati, Hamilton Ohio data center advance despite environmental, energy concerns · Local12/WKRC
- Feasibility study for Hamilton data center paused as developer considers next steps · WVXU / Cincinnati Public Radio
- Butler County Commissioners approve short-term data center moratorium · WVXU / Cincinnati Public Radio
- Hamilton Innovation Center · CleanView
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID logistix-hamilton-innovation-center-butler-county-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.